A Class B hoarding over the Hall Street footpath that doubles as the formwork deck for the curved awning slab of a new mixed-use building, designed for CEIG.
The project
A new mixed-use building on Hall Street, Bondi Beach, one block from the beach. The Level 1 slab runs out over the footpath as an awning with a scalloped, curving edge, and the footpath below had to stay open to the public the whole time.
That meant one structure had to do two jobs: a Class B hoarding that keeps people walking safely underneath, and a deck strong and stiff enough to form and pour the awning slab on top of it.
What we did
Metric Engineering designed the hoarding as the falsework for the awning. Three lines of adjustable jacks carry LVL bearers and a ply deck, with a 1.2 m clear walkway kept open underneath and a deck-level walkway with edge protection out past the kerb.
We checked every stage of the pour, from the empty deck to the full slab, for the jacks, bearers, soles and deflection, and set the rules the crew builds to: concrete stops at the last jack line, bearers sit centred in the U-heads, and joints land over supports. The design was issued with a signed design certificate.
CEIG built it. The photos show their formwork: the curved edge forms follow the awning line cleanly, with tight joints and a flat, true deck.
The deck is formed and the reinforcement is in, with the footpath open below.