Temporary works · 7 min read
Hoardings in the City of Sydney: Type A and Type B
The City of Sydney sees more hoardings than any other council in NSW: CBD towers, terraces and heritage buildings built hard to the footpath. Here is how its rules work and what the engineering has to cover.
Read the guide
Guides
Straight answers for builders.
Practical guides from our engineers on hoardings, back-propping, formwork, shoring, stormwater and inspections in Sydney and NSW: what is needed, what to send, and what comes back.
Temporary works · 7 min read
Hoardings in the City of Sydney: Type A and Type B
The City of Sydney sees more hoardings than any other council in NSW: CBD towers, terraces and heritage buildings built hard to the footpath. Here is how its rules work and what the engineering has to cover.
Read the guide
Temporary works · 6 min read
Crane on a suspended slab: back-propping design
A suspended slab is designed for the building it belongs to, not for a crane outrigger. When a crane, concrete pump or hoist has to set up on one, the slab needs checking and usually propping.
Read the guide
Stormwater · 7 min read
On-site detention (OSD) in Sydney: a guide
On-site detention holds stormwater back on the lot and lets it out slowly, so new development does not flood the street. It is one of the most common reasons a design changes late. Here is how to get ahead of it.
Read the guide
Temporary works · 6 min read
Formwork design and certification to AS 3610.1
Formwork carries more load during the pour than most parts of the finished building ever will. AS 3610.1 sets out how it is designed, documented and checked. Here is what that means on site.
Read the guide
Temporary works · 7 min read
Shoring and excavation next to a boundary
Digging a basement hard against a neighbour's house or a footpath is where temporary works carry the most risk. The shoring design decides how much the ground moves, and what the neighbours see.
Read the guide
Structural · 5 min read
Pre-pour reinforcement inspections explained
Once concrete is poured, the reinforcement inside it can never be checked again. That is why certifiers ask for an engineer's inspection before footings and slabs are poured.
Read the guide
Send us your drawings.
We’ll reply within 24 hours with a fixed-fee proposal.
TransmittalTo: Metric Engineering
- 01Architectural plans
- 02Survey
- 03Geotechnical report
- 04Site photos
ReturnedFixed-fee proposal within 24 hours
Send what you have.