Structural and stormwater design, inspections and the final certificate for a new two-storey home in Strathfield on reactive clay, with piers kept clear of a sewer main.
The project
A new two-storey home in Strathfield on highly reactive clay (Class H1), with a concrete first floor and stairs. A sewer main runs beside the site, so the piers near it had to stay out of its zone of influence and found below it.
What we did
Metric Engineering designed the structure (bored piers, a raft slab, the suspended first floor and the stairs) to AS 3600 and AS 2870, and the stormwater, with a flood compliance statement.
We inspected each stage on site, the piers, the slab, the first floor, the framing and the stairs, and issued the final structural certificate when the house was finished.
Complete. Final structural certificate issued in May 2025.